Minutes of Scifi weekly meeting (00/July/17)

From: Makoto Sakuda (sakuda@neutrino.kek.jp)
Date: Mon Jul 17 2000 - 10:52:04 JST

  • Next message: Taku Ishida: "scifi water leak monitor stable after earthquake"

    Message-Id: <200007170152.KAA12163@neutrino.kek.jp>
    Subject: Minutes of Scifi weekly meeting (00/July/17)
    Date: Mon, 17 Jul 2000 10:52:04 +0900
    From: Makoto Sakuda <sakuda@neutrino.kek.jp>
    
    Subject: Minutes of Scifi weekly meeting (00/July/17)
    
    1. SciFi HV was turned off last week. 
       IIT maintenance by Hamamatsu is scheduled in August.
       Black sheeting of SciFi detector will be doubled 
       in September.    -- Sakuda
    
    2. Monitor  -- Iwashita
     Semi-online monitor worked at the end of June run.
     He will add more useful histograms during summer.
      Raw distributions (pixels, ADC), Filtered distributions
    (N-pix,Hit fibers), Tracking info (N-tracks, Tracks*VETO),
     and N-pix (corrected) for tracks.
    
    3. Tracker -- Park
     After he set up the criteria, SNU (Bockjoo) will study it
    with MC and real events. Kobe group will do the scan too.
    
    4. EL data 
     Yokoyama finished EL calibration for June data (double
     check). She will look at the gain variations.
    
    5. Iwashita checked a few subruns in Jun00 data which Eunju
    found noisy.  
    
    6. Alignment note by Bockjoo Kim (SNU) in Web.
     He considered the effects of (1) fiber curvature, (2)
    rotation, and (3) sheet-by-sheet shift, and obtained the
     position resolution of 0.6mm, which is about 0.2mm better
    than the previous number. This value (0.6mm) is almost equal 
    to the number in Monte Carlo, which means that the
    alignment is perfect. There are large residuals in the first 
    and the last layers, where we know that modules are curved.
    
    This is a good work. 
    //
    
     
    
    
       
    



    This archive was generated by hypermail 2b29 : Mon Jul 17 2000 - 10:52:17 JST