Re: Mintues of 1kt meeting (May 21, 2003)

From: Koichiro Nishikawa (nishikaw@neutrino.kek.jp)
Date: Thu May 22 2003 - 20:51:52 JST

  • Next message: Yoichiro Suzuki: "Re: Mintues of 1kt meeting (May 21, 2003)"

    Message-ID: <3ECCB9D8.2050501@neutrino.kek.jp>
    Date: Thu, 22 May 2003 20:51:52 +0900
    From: Koichiro Nishikawa <nishikaw@neutrino.kek.jp>
    Subject: Re: Mintues of 1kt meeting (May 21, 2003)
    
    Itow-san and others,
    
    I have not seem any pi0 related subject.
    Could you tell me what is happening?
    
    Regards,
    
    K.Nishikawa
    
    Yoshitaka Itow wrote:
    
    >Minuets of local 1kt meeting (May 21, 2003)
    >Kamioka;Miura
    >KEK;Asia,Antonty
    >Kashiwa;Itow
    >
    >
    >1) Hardware status (Asia)
    >
    >* WEB TMC ch8 monitor has stopped  for a while due to nurock replacements.
    >* FTP problem of water system was fix, while water system is ofcource OK.
    >* UV lamp of water system will be replaced by Roy at Jun 6 ~ 7.
    >* After Asia will stat at Kamioka from May 27, Kameda will take over 
    >  water system until Mine comes in Jun.
    >
    >2) Offline/reduction shift (Antony)
    >
    >Report from reduction shift (Antony).
    >Timing problem of ch8 in web in Run4411 only in short subrun 3.
    >Other are fine.
    >We should use "Short run" instead of "Junk Run" for reduction shift.
    >"Junk run" should be used for real garbage run.
    >
    >3) PID study (Antony)
    >
    >He studied PID with and without Cherenkov angle information for 
    >-100cm,0cm, +100cm vertex shift. The results are
    >
    >       -100cm                0cm               +100cm
    >      w/      w/o     w/       w/o          w/       w/o
    >mu  0.4%       0%    0%         0%          7%      12%
    >e   12 %      9.1%    2.1%    1.6%        1.2%     1.1%     
    >
    >
    >4) Ni/Laser data for QE calibration (Antony)
    >
    >Now old Ni data files were found. Antony will check it.
    >He will check also low-intensity TQmap laser data.
    >He will obtain 1pe distribution for each PMT with low intesity laser 
    >and QE table for each PMT from Ni data.
    >If he needs, he will take new Ni and low intensity data 
    >( with lower ATM threshold if needed ) after Jun shutdown.
    >
    >
    >5) Laser injection (Asia)
    >
    >She replaced measured laser wave length by 415.5nm with gaussian 
    >from monocromatic 410nm for 410nm run set. 
    >It increase reflection light in MC. 
    >
    >6) Asia will stay at  Kamioka durin June to finalize water parameter 
    >   and tune 1kt PID pattern template.
    >
    >7) NSK (Miura)
    >
    > Nnu/N1peak vs period seems stable. But in Ntotpeak/CT vs period, 
    > 2003 run shows increasing.
    > Also they scattered by 1% which is much bigger than statistical fluctiation. 
    > He will check time dependent systematic error of Ntotpeak due to 3% 
    > of stability of FADC constant given by Hayashi.
    >
    >Next meeting with video to US,  May 30th (Fri) 9:00 am (JST) 
    >
    >
    >Regards,
    >
    >Y.Itow
    >  
    >
    



    This archive was generated by hypermail 2.1.0 : Thu May 22 2003 - 20:54:01 JST