Minutes of the K2K SK-data meeting, Apr. 24, 2003 (fwd)

From: OBAYASHI Yoshihisa (ooba@suketto.icrr.u-tokyo.ac.jp)
Date: Tue Apr 29 2003 - 09:57:55 JST

  • Next message: OBAYASHI Yoshihisa: "Errata: Minutes of the K2K SK-data meeting, Apr. 24, 2003 (fwd)"

    Date: Tue, 29 Apr 2003 09:57:55 +0900 (JST)
    From: OBAYASHI Yoshihisa <ooba@suketto.icrr.u-tokyo.ac.jp>
    Subject: Minutes of the K2K SK-data meeting, Apr. 24, 2003 (fwd)
    Message-ID: <Pine.SOL.3.96LJ1.1b7.1030429095631.10851A-100000@suketto1>
    
    
    Minutes of the K2K SK-data meeting
    
    1) SK data update
    
    SK data taking was fine during last 1 week.
    1 on-time FC event and 0 off time FC event was found.
    Golden-week shutdown from Apr.25 9:00 - 
    
    2) TQreal reprocess
    
    Apply TQ conversion with latest parameters.
    For k2k, apply only for the events within |tdiff_gps|<500us,
    to save CPU and tape access time.
    
    This reprocess wil be start just after beam stop.
    Though OD aclibration is not finished yet, TQ reprocess start
    before OD work finish. If OD calibration finished in time, 
    TQ re-re-process will be done.
    
    SK badrun selection will be finished in Apr.25 
    
    3) MC, Calibration and Fitter status
    
    *Calibration:
    Ni calibration, Non-linearity correction and pc2pe constant are
    finalised.
    
    *MC tuning:
    MC gain is tuned by cosmic muon data. 
    Absolute energy scale ischecked by decay-electron MC/data:
      +5.7% in MC/data of PE50
      +2.7% in MC/data of N50
    -> energy scale systematic could be +-3%
    
    *Fitter
    Major modified point in autofit: 
    Treatment of not-existing tube in stmufit and ring edge pointing.
    
    Position resolution of afit is estimated.
    -> position resolution is almost same level of sk1.
    -> vertex shifts systematically for high energy(Pmu>1.5GeV) muons in ~40cm
       but effect for K2K events is small
    
    In total, Efficiency of fiducial volume cut (and 200MeV cut) will be estimated
    by these MC/Fitter.
    
    4) Water parameter problem
    
    Miura reported a problem recentry found in the determination of
    latest water parameter which is done at Oct., 2001 collabration meeting.
     
    5) Next meeting: Thu. May, 1 10:30 AM -
    
    Best regards, Yoshihisa OBAYASHI
    Sorry for delay of the circulation of this minutes.
    
    On Wed, 23 Apr 2003, OBAYASHI Yoshihisa wrote:
    
    > 
    > Agenda for the K2K-SK data meeting,
    > 
    > 	Thu. Apr., 24, 11:00-
    > 
    > 1) SK data update (Obayashi)
    > 
    > 2) TQreal reprocess for data (Obayashi)
    > 
    > 3) MC and Fitter status (Kaneyuki)
    > 
    > 4) Water parameter (Miura or Moriyama)
    > 
    > 5) Others
    > 
    > Best regards,
    > YO
    > 
    > 
    



    This archive was generated by hypermail 2.1.0 : Tue Apr 29 2003 - 09:59:24 JST