Agenda still to be updated

From: Koichiro Nishikawa (nishikaw@neutrino.kek.jp)
Date: Sun Jun 06 1999 - 15:04:53 JST


Message-Id: <199906060604.PAA09234@neutrino.kek.jp>
Subject: Agenda still to be updated
Date: Sun, 06 Jun 1999 15:04:53 +0900
From: Koichiro Nishikawa <nishikaw@neutrino.kek.jp>

6/7     Results from March-May run

	8:30-9:00	exec. committee (room 307 kenkyuu-honkan)

 Lecture hall in Kenkyu-honkan

	******* analysis  *****

	9:00-9:30	beam line components analysis
                         9:00-9:10 Pion Monitor (Maruyama)   
                         9:10-9:20 Muon Monitor (Maruyama or Inagaki)   
                         9:20-9:30 Ionocopter (Jim Hill)   

	9:30-10:00	1kton calibration,reconstruction etc.
	10:00-10:30	Sci-fi performance
			SciFi detector			SuzukiAT  15min
			Performance of SciFi detector	H.Park   25min
	10:30-11:00	veto/trigger performance
	11:00-11:30	LG performance
	11:30-12:00	muon performance
			Hardware history		T. Ishii    15min
			Analysis routine		A. Sakai    15min


- ------lunch------   

        RESULTS

	13:30-14:00	beam-line (monitors,steering )	Maruyama    30min
	14:00-14:30	1kton results
	14:30-15:00	muon 
			results of various running conditions	
							T. Inagaki  30min

- ------break------

	15:30-16:00	Sci-Fi
	Event Selection and nu_mu flux and spectrum	H.Ishino    20min
	Study of 2 track events and NC events		C.Walter    10min
	16:00-16:30	LG
	16:30-17:00	SK,GPS

	discussion

	18:00-19:00	collaboration council

6/8	present effort and future plan

Seminar hall in 3 Lecture hall

	9:00 -9:15	Schedule
	9:15 -9:30	PS, beam-line status
	9:30 -10:30	software merge(repositry unification), data maintenance
	10:30-11:00	beam monitor
                         10:30-10:40 More on the Pion Monitor (Maruyama)
                         10:40-10:50 More on the Ionocopter(Jim Hill)
                         10:30-10:40 Upgrade of Monitors (Hasegawa)

	11:00-12:00	1kton 


- -------LUNCH----------

	13:30-15:00	Sci-fi 
			Monte Carlo  (25min)                Boyd
			EL calibration  (15min)             Iwashita
			 Position corrections  (10min)      Urszula
			 Linearity corrections (10min)      Sharkey
			Off spill data analysis and cosmic-ray contamination
                          (15min)      Kadowaki
			Electronics modifications during summer  (10min) Aoki/Hayato
			User-friendly Scifi software    (10min)     Ishida
			Summary                 (20min)     Sakuda

- -------break---------

	15:30-16:00	Trigger
	16:00-16:30	LG
	16:30-17:00	Muon
			Performance (bad channels)	JH. Choi    15min
			Muon software			A. Sakai    15min



This archive was generated by hypermail 2b29 : Tue Feb 01 2000 - 15:37:57 JST